Commencement Date/ 2018 Project Overview/ The work includes preparing، transporting، and installing control towers with different designs، as well as constructing and implementing a security fence […]
Commencement Date/ 2018 Project Overview/ The project includes various earthworks، asphalt and concrete paving of several roads (9.0 km) with different specifications from one area to […]
Commencement Date: 2021 Scope of work: the project included but not limited، construction of roads included rain water drainage system inside GPP and LPG area .the […]
Overview of the Project/ The work includes the construction and furnishing of two steel structure sulfur storage، equipped with a fire extinguishing system and storage facilities. […]
Commencement Date/ 2020 Project: the construction of a pipeline network for transporting natural gas and crude oil in the Halfaya Oil Field – Maysan. Commencement Date/ […]
Commencement Date/ 2020 Project Overview/ The work includes pouring and preparing 650 precast Piles (30*30CM)with a total length of 19 meter for the foundations of eleven […]
Commencement Date/ 2018 Project Overview: This project involved all earthworks up to the asphalt layer of the work which consisted of two layers (12 cm، 6 […]
Our Work with China Petroleum Engineering and Construction Corporation Commencement Date: 2017 Brief Overview: The work included excavating over 3،000 m³ to build a brick wall […]
The projects include all road paving and landscaping works for the West Qurna 2 field، in addition to road paving and infrastructure works for internal and […]