May 31, 2024

Supply، transport، and installation of concrete slabs and observation towers for Zone S1 & S2 in the East Baghdad Field.

Commencement Date/ 2018 Project Overview/ The work includes preparing، transporting، and installing control towers with different designs، as well as constructing and implementing a security fence […]
May 31, 2024

Construction of Sulfur Storage Units 1 & 2 and Guard Room No. (3) in the Halfaya Oil Field – Maysan.

Overview of the Project/ The work includes the construction and furnishing of two steel structure sulfur storage، equipped with a fire extinguishing system and storage facilities. […]
May 31, 2024

the construction of a pipeline network for transporting natural gas and crude oil in the Halfaya Oil Field – Maysan.

Commencement Date/ 2020 Project: the construction of a pipeline network for transporting natural gas and crude oil in the Halfaya Oil Field – Maysan. Commencement Date/ […]
May 31, 2024

Construction and preparation of precast concrete foundations for spherical tank foundations and construction of spherical tank foundations for the CPF within the Halfaya Oil Field (GPP)– Maysan.

Commencement Date/ 2020 Project Overview/ The work includes pouring and preparing 650 precast Piles (30*30CM)with a total length of 19 meter for the foundations of eleven […]
May 31, 2024

Construction of Walls for the (CPF) Area in the Halfaya Oil Field، Maysan Governorate

Our Work with China Petroleum Engineering and Construction Corporation Commencement Date: 2017 Brief Overview: The work included excavating over 3،000 m³ to build a brick wall […]